Sciweavers

7380 search results - page 1470 / 1476
» time 2008
Sort
View
TASE
2008
IEEE
13 years 10 months ago
Stochastic Modeling of an Automated Guided Vehicle System With One Vehicle and a Closed-Loop Path
Abstract--The use of automated guided vehicles (AGVs) in material-handling processes of manufacturing facilities and warehouses isbecomingincreasinglycommon.AcriticaldrawbackofanAG...
Aykut F. Kahraman, Abhijit Gosavi, Karla J. Oty
TASE
2008
IEEE
13 years 10 months ago
New Hybrid Optimization Algorithms for Machine Scheduling Problems
Dynamic programming, branch-and-bound, and constraint programming are the standard solution principles for nding optimal solutions to machine scheduling problems. We propose a new ...
Yunpeng Pan, Leyuan Shi
TASE
2008
IEEE
13 years 10 months ago
An Optimization-Based Approach for Design Project Scheduling
Concurrent engineering has been widely used in managing design projects to speed up the design process by concurrently performing multiple tasks. Since the progress of a design tas...
Ming Ni, Peter B. Luh, Bryan Moser
TASE
2008
IEEE
13 years 10 months ago
Modeling and Supervisory Control of Railway Networks Using Petri Nets
In this paper we deal with the problem of modeling railway networks with Petri nets so as to apply the theory of supervisory control for discrete event systems to automatically de...
Alessandro Giua, Carla Seatzu
TASE
2008
IEEE
13 years 10 months ago
New Solution Approaches to the General Single- Machine Earliness-Tardiness Problem
This paper addresses the general single-machine earliness-tardiness problem with distinct release dates, due dates, and unit costs. The aim of this research is to obtain an exact n...
Hoksung Yau, Yunpeng Pan, Leyuan Shi
« Prev « First page 1470 / 1476 Last » Next »