Sciweavers

ISCAS
2005
IEEE

Lower-bound estimation for multi-bitwidth scheduling

14 years 5 months ago
Lower-bound estimation for multi-bitwidth scheduling
In high-level synthesis, accurate lower-bound estimation is helpful to explore the search space efficiently and to evaluate the quality of heuristic algorithms. For the lower-bound estimation of the scheduling problems, previous works mainly focus on the number of resources with uniform bitwidth. In this paper, we study the problem of lower-bound estimation on bitwidth summation of functional units for multi-bitwidth scheduling, where data-paths are composed of operations with various bitwidth. An integer linear programming (ILP) formulation and a polynomial time algorithm are presented. Experimental results indicate that the proposed algorithm produces good estimation, only 2% lower than the optimal results, which are obtained from ILP.
Junjuan Xu, Jason Cong, Xu Cheng
Added 25 Jun 2010
Updated 25 Jun 2010
Type Conference
Year 2005
Where ISCAS
Authors Junjuan Xu, Jason Cong, Xu Cheng
Comments (0)