Sciweavers

WSC
1998

The Use of Simulation in the Planning of the Dutch Railway Services

14 years 25 days ago
The Use of Simulation in the Planning of the Dutch Railway Services
The design of a quality timetable for the Dutch Railways is a complex task, because of the characteristics of the railway services. The complexity of the network and the heavily interrelated behavior of train operations, often cause small disturbances to lead to heavily disturbed operations. As a result the passenger often experiences less reliability and punctuality of the railway services than desired. Supporting the planning process with the right tools is therefore a must to guarantee a high quality of the final railway services. The design of a timetable is already fully supported by the Decision Support System DONS (Designer of Network Schedules). To evaluate the robustness of a timetable, Railned decided to construct a simulator as an advanced analysis function for the DONSsystem. The DONS-Simulator enables us to study the effect of small disturbances on the punctuality of train operations in the full Dutch network. To avoid cumbersome and error-prone data entry to construct a ...
Jurjen S. Hooghiemstra, Maurice J. G. Tunisse
Added 01 Nov 2010
Updated 01 Nov 2010
Type Conference
Year 1998
Where WSC
Authors Jurjen S. Hooghiemstra, Maurice J. G. Tunisse
Comments (0)