Sciweavers

DAM
2016

Scheduling co-operating stacking cranes with predetermined container sequences

8 years 7 months ago
Scheduling co-operating stacking cranes with predetermined container sequences
Crane scheduling in container terminals is known as a difficult optimization problem that has become even more challenging in recent years with the proliferation of multi-gantry automated stacking cranes. In this paper we present an efficient algorithm solving a subproblem arising in this context, namely deciding the priority of cranes after transportation tasks have been assigned. We tackle this problem for both, twin crane setting and crossover crane setting, and develop graphical models and strongly polynomial algorithms accordingly. A series of experiments is carried out where it is shown that the method can produce optimum solutions within exceptionally small run times.
Dirk Briskorn, Panagiotis Angeloudis
Added 01 Apr 2016
Updated 01 Apr 2016
Type Journal
Year 2016
Where DAM
Authors Dirk Briskorn, Panagiotis Angeloudis
Comments (0)