Sciweavers

ETFA
2006
IEEE

Component based deployment of industrial control systems: a hybrid scheduling approach

14 years 3 months ago
Component based deployment of industrial control systems: a hybrid scheduling approach
This paper deals with the IEC 61499 standard. A function block (FB) is an event triggered component and an application is a distributed FBs network on several devices. We consider these devices as multi-tasking PLCs. To validate the temporal behavior inside a device, we propose a hybrid scheduling approach combining off-line and on-line policies. This approach transforms application blocks into tasks thanks to the off-line policy. Then, it checks their required on-line feasibility. On the other hand, we propose also a temporal charcaterization of exchanged messages between devices to check also their online feasibility. Keywords. Component, Function Blocks, PLCs, Real Time, Scheduling.
Mohamed Khalgui, Xavier Rebeuf, Françoise S
Added 22 Aug 2010
Updated 22 Aug 2010
Type Conference
Year 2006
Where ETFA
Authors Mohamed Khalgui, Xavier Rebeuf, Françoise Simonot-Lion
Comments (0)