Sciweavers

WSC
2000

Productivity modeling of semiconductor manufacturing equipment

14 years 1 months ago
Productivity modeling of semiconductor manufacturing equipment
Optimizing a semiconductor wafer fab requires balancing technology and productivity. Recent work on productivity modeling will be described and focus on discrete event simulation models of unitary tool, modules, and whole fab. In addition, some related cost-modeling aspects will be presented. The Applied Materials Turbo Modules Environment is reviewed. Turbo-Modules Unitary Tool Models (UTM) were developed for determining a configured tool's performance, and the Tool Group Models (TGM) were developed for exploring module and fab modeling. Turbo-Modules is based on AutoSimulations, Inc. (ASI) AutoSched AP's open architecture and a customized Graphical User Interface (GUI). The presentation provides a case study performed to analyze the loss of accuracy in a tool group model by modeling unitary tools as black box. Some fab cost modeling will be discussed.
Mark Pool, Robert Bachrach
Added 01 Nov 2010
Updated 01 Nov 2010
Type Conference
Year 2000
Where WSC
Authors Mark Pool, Robert Bachrach
Comments (0)