Sciweavers

290 search results - page 5 / 58
» A Time and Resource Problem for Planning Architectures
Sort
View
WSC
2000
13 years 9 months ago
An analytical model and an optimal scheduling heuristic for collective resource management
In the this paper, we study the problem of collective resource management. We first introduce the problem through realworld examples. Then we generalize the problem and build an a...
Qiang Sun
JUCS
2010
142views more  JUCS 2010»
13 years 6 months ago
Mobile Agent Routing with Time Constraints: A Resource Constrained Longest-Path Approach
: Mobile agent technology advocates the mobility of code rather than the transfer of data. As data is found in several sites, a mobile agent has to plan an itinerary to visit sever...
Eduardo Camponogara, Ricardo Boveto Shima
PUK
2000
13 years 9 months ago
Scheduling in a Planning Environment
In a real planning problem, there exists a set of constraints (both temporal constraints and resource usage constraints) which must be satisfied in order to obtain a feasible plan....
Antonio Garrido Tejero, Miguel A. Salido, Federico...
AUSAI
2004
Springer
14 years 1 months ago
A Comparison of BDI Based Real-Time Reasoning and HTN Based Planning
The Belief-Desire-Intention (BDI) model of agency is an architecture based on Bratman’s theory of practical reasoning. Hierarchical Task Network (HTN) decomposition on the other ...
Lavindra de Silva, Lin Padgham
WSC
1997
13 years 9 months ago
A Simulation-Based Backward Planning Approach for Order-Release
The problem of order release planning for a make-toorder production facility is addressed. Traditionally, order-release planning in a multi-stage shop is performed with material r...
Edward F. Watson, Deborah J. Medeiros, Randall P. ...