Sciweavers

70 search results - page 5 / 14
» A feasibility pump heuristic for general mixed-integer probl...
Sort
View
ICC
2008
IEEE
159views Communications» more  ICC 2008»
14 years 1 months ago
Link Scheduling and Power Control in Wireless Mesh Networks with Directional Antennas
— Directional antennas are very attractive in Wireless Mesh Networks (WMN). We study the problem of link scheduling and power control in a Time-Division Multiple Access (TDMA) WM...
Vishwanath Ramamurthi, Abu Ahmed Reaz, Sudhir S. D...
WEA
2010
Springer
241views Algorithms» more  WEA 2010»
14 years 1 months ago
A Branch-and-Price Algorithm for Multi-mode Resource Leveling
Resource leveling is a variant of resource-constrained project scheduling in which a non-regular objective function, the resource availability cost, is to be minimized. We present ...
Eamonn T. Coughlan, Marco E. Lübbecke, Jens S...
COR
2007
80views more  COR 2007»
13 years 7 months ago
Scheduling with tool changes to minimize total completion time under controllable machining conditions
Scheduling under controllable machining conditions has been studied for some time. Scheduling with tool changes, particularly due to tool wear, has just begun to receive attention...
M. Selim Akturk, Jay B. Ghosh, Rabia K. Kayan
HPCN
1995
Springer
13 years 10 months ago
Discrete optimisation and real-world problems
In the global economy, proper organisation and planning of production and storage locations, transportation and scheduling are vital to retain the competitive edge of companies. Th...
Josef Kallrath, Anna Schreieck
EOR
2007
101views more  EOR 2007»
13 years 7 months ago
Using aggregation to optimize long-term production planning at an underground mine
Motivated by an underground mining operation at Kiruna, Sweden, we formulate a mixed integer program to schedule iron ore production over multiple time periods. Our optimization m...
Alexandra M. Newman, Mark Kuchta