Sciweavers

638 search results - page 63 / 128
» Activity-Based Scheduling of IT Changes
Sort
View
EUROPAR
2006
Springer
15 years 7 months ago
On-Line Adaptive Parallel Prefix Computation
Abstract. We consider parallel prefix computation on processors of different and possibly changing speeds. Extending previous works on identical processors, we provide a lower boun...
Jean-Louis Roch, Daouda Traoré, Julien Bern...
108
Voted
WWW
2006
ACM
16 years 4 months ago
Dynamic placement for clustered web applications
We introduce and evaluate a middleware clustering technology capable of allocating resources to web applications through dynamic application instance placement. We define applicat...
A. Karve, Tracy Kimbrel, Giovanni Pacifici, Mike S...
99
Voted
ICCAD
1997
IEEE
106views Hardware» more  ICCAD 1997»
15 years 7 months ago
BIST TPG for faults in system backplanes
A built-in self-test (BIST) methodology to test system backplanes by using BIST functionality in each of its constituent boards is presented. Since the configurations of systems ...
Chen-Huan Chiang, Sandeep K. Gupta
WSC
2008
15 years 5 months ago
Coping with typical unpredictable incidents in a logic fab
Within the last months the semiconductor plant of Infineon in Dresden has converted to a pure manufacturer of logic products. With it, premises for production control have changed...
Wolfgang Scholl
WSC
1997
15 years 4 months ago
AutoSched Tutorial
The AutoSchedTM finite capacity planning and scheduling tool helps you increase throughput, reduce in-process inventory, and increase equipment and personnel utilization. AutoSche...
Bill Lindler