Sciweavers

3 search results - page 1 / 1
» Airport Gate Scheduling with Time Windows
Sort
View
AIR
2005
114views more  AIR 2005»
13 years 11 months ago
Airport Gate Scheduling with Time Windows
In contrast to the existing airport gate assignment studies where flight have fixed schedules, we consider the more realistic situation where flight arrival and departure times can...
Andrew Lim, Brian Rodrigues, Yi Zhu
EOR
2008
110views more  EOR 2008»
13 years 11 months ago
Runway sequencing with holding patterns
We study a scheduling problem, motivated by air-traffic control, in which a set of aircrafts are about to land on a single runway. When coming close to the landing area of the air...
Konstantin Artiouchine, Philippe Baptiste, Christo...
AIPS
2007
14 years 1 months ago
Context-Aware Logistic Routing and Scheduling
In context-aware route planning, agents have to plan their route on a common infrastructure in such a way that plans made by other agents are not invalidated, and no conflicts ar...
Adriaan ter Mors, Jonne Zutt, Cees Witteveen