Sciweavers

11 search results - page 1 / 3
» An Improved Hybrid Model for the Generic Hoist Scheduling Pr...
Sort
View
ANOR
2002
67views more  ANOR 2002»
13 years 7 months ago
An Improved Hybrid Model for the Generic Hoist Scheduling Problem
Abstract. The generic hoist scheduling problem is NP-hard and arises from automated manufacturing lines. In recent work using the constraint logic programming (CLP) formalism, a un...
Daniel Riera, Neil Yorke-Smith
TASE
2010
IEEE
13 years 2 months ago
Optimization of Group Elevator Scheduling With Advance Information
Group elevator scheduling has received considerable attention due to its importance to transportation efficiency for mid-rise and high-rise buildings. One important trend to improv...
Jin Sun, Qianchuan Zhao, Peter B. Luh
GECCO
2007
Springer
196views Optimization» more  GECCO 2007»
14 years 1 months ago
An estimation of distribution algorithm with guided mutation for a complex flow shop scheduling problem
An Estimation of Distribution Algorithm (EDA) is proposed to approach the Hybrid Flow Shop with Sequence Dependent Setup Times and Uniform Machines in parallel (HFSSDST-UM) proble...
Abdellah Salhi, José Antonio Vázquez...
CASES
2007
ACM
13 years 11 months ago
A fast and generic hybrid simulation approach using C virtual machine
Instruction Set Simulators (ISSes) are important tools for cross-platform software development. The simulation speed is a major concern and many approaches have been proposed to i...
Lei Gao, Stefan Kraemer, Rainer Leupers, Gerd Asch...
CPAIOR
2010
Springer
14 years 8 days ago
A Constraint Integer Programming Approach for Resource-Constrained Project Scheduling
Abstract. We propose a hybrid approach for solving the resource-constrained project scheduling problem which is an extremely hard to solve combinatorial optimization problem of pra...
Timo Berthold, Stefan Heinz, Marco E. Lübbeck...