We consider the problem of minimizing staffing costs in an inbound call center, while maintaining an acceptable level of service in multiple time periods. The problem is complicat...
The problem of production and delivery lot-sizing and scheduling of set of items in a two-echelon supply chain over a finite planning horizon is addressed in this paper. A single ...
This paper presents a new method called Transition-based RRT (T-RRT) for path planning problems in continuous cost spaces. It combines the exploration strength of the RRT algorith...
: Models from methods like Contextual Design (CD) are a sound basis for requirements engineering. But current software engineering processes are not prepared to use such models. To...
To effectively generate a fast and consistent apartment construction project network, Hyundai and KAIST have developed a case and constraint based project planning expert system f...
Kyoung Jun Lee, Hyun Woo Kim, Jae Kyu Lee, Tae Hwa...