Sciweavers

66 search results - page 8 / 14
» Bridging the Gap between Task Planning and Path Planning
Sort
View
CP
2005
Springer
14 years 1 months ago
Speeding Up Constrained Path Solvers with a Reachability Propagator
Constrained path problems have to do with finding paths in graphs subject to constraints. One way of constraining the graph is by enforcing reachability on nodes. For instance, i...
Luis Quesada, Peter Van Roy, Yves Deville
ICRA
2010
IEEE
220views Robotics» more  ICRA 2010»
13 years 6 months ago
Autonomous Underwater Vehicle trajectory design coupled with predictive ocean models: A case study
— Data collection using Autonomous Underwater Vehicles (AUVs) is increasing in importance within the oceanographic research community. Contrary to traditional moored or static pl...
Ryan N. Smith, Arvind Pereira, Yi Chao, Peggy Li, ...
JNSM
2008
130views more  JNSM 2008»
13 years 7 months ago
Declarative Infrastructure Configuration Synthesis and Debugging
There is a large conceptual gap between end-to-end infrastructure requirements and detailed component configuration implementing those requirements. Today, this gap is manually br...
Sanjai Narain, Gary Levin, Sharad Malik, Vikram Ka...
EOR
2006
66views more  EOR 2006»
13 years 7 months ago
Performance prediction of an unmanned airborne vehicle multi-agent system
Consider unmanned airborne vehicle (UAV) control agents in a dynamic multi-agent system. The agents must have a set of goals such as destination airport and intermediate positions...
Zhaotong Lian, Abhijit Deshmukh
AIPS
2010
13 years 10 months ago
When Policies Can Be Trusted: Analyzing a Criteria to Identify Optimal Policies in MDPs with Unknown Model Parameters
Computing a good policy in stochastic uncertain environments with unknown dynamics and reward model parameters is a challenging task. In a number of domains, ranging from space ro...
Emma Brunskill