Scheduling Software Projects to Minimize the Development Time and Cost with a Given Staff
A probabilistic scheduling model for software projects is presented. The model explicitly takes a scheduling strategy as input. When the scheduling strategy is fixed, the model ou...
Frank Padberg
125
Voted
EURODAC
1995
IEEE
100views VHDL» more  EURODAC 1995»
15 years 8 months ago
A unified approach to the extraction of realistic multiple bridging and break faults
The presented fault model uniquely describes all structural changes in the transistor net list that can be caused by spot defects, including faults that connect more than two nets...
Gerald Spiegel, Albrecht P. Stroele
WSC
2004
15 years 5 months ago
Simulation of Coherent Risk Measures
In financial risk management, a coherent risk measure equals the maximum expected loss under several different probability measures, which are analogous to systems in ranking and ...
Vadim Lesnevski, Barry L. Nelson, Jeremy Staum
AML
2008
66views more  AML 2008»
15 years 4 months ago
Algorithmic randomness of continuous functions
We investigate notions of randomness in the space C(2N ) of continuous functions on 2N . A probability measure is given and a version of the Martin-L
George Barmpalias, Paul Brodhead, Douglas A. Cenze...
CORR
2008
Springer
85views Education» more  CORR 2008»
15 years 4 months ago
Quantifying Timing Leaks and Cost Optimisation
We develop a new notion of security against timing attacks where the attacker is able to simultaneously observe the execution time of a program and the probability of the values of...
Alessandra Di Pierro, Chris Hankin, Herbert Wiklic...