This paper describes the integration of the Berkeley Architectural Walkthrough Program with the National Institute of Standards and Technology’s CFAST fire simulator. The integ...
In an industry project with a German car manufacturer we are faced with the challenge of placing a maximum number of uniform rigid rectangular boxes in the interior of a car trunk...
Friedrich Eisenbrand, Stefan Funke, Andreas Karren...
The Cell Formation Problem is a crucial component of a cell production design in a manufacturing system. This problem consists of a set of product parts to be manufactured in a gr...
Andres Pailla, Athila R. Trindade, Victor Parada, ...
—This paper proposes a general scheduling model that extends job-shop scheduling models to incorporate important features of real manufacturing systems. More precisely, each oper...
The play-in/play-out approach is a method for specifying and developing complex reactive systems. It is built upon a scenariobased philosophy, and uses the language of live sequenc...