Scheduling of a construction project requires: a) hierarchical decomposition of the project; b) incorporation of risk and uncertainty in the activity time and cost estimates; and ...
Abstract. This paper presents the role of meta-modelling and graph transformation in our approach for the modelling, analysis and simulation of complex systems. These are made of c...
This paper presents a Boolean based symbolic model checking algorithm for the verification of analog/mixedsignal (AMS) circuits. The systems are modeled in VHDL-AMS, a hardware des...
David Walter, Scott Little, Nicholas Seegmiller, C...
We give a description of a Petri net-based framework for modelling and analysing biochemical pathways, which unifies the qualitative, stochastic and continuous paradigms. Each per...