Sciweavers

334 search results - page 25 / 67
» Feedback-Feedforward Scheduling of Control Tasks
Sort
View
IROS
2008
IEEE
151views Robotics» more  IROS 2008»
14 years 1 months ago
A performance sensitive hormone-inspired system for task distribution amongst evolving robots
— A hormone-inspired task scheduling method is described which assigns tasks to a group of robots, taking into account the robots’ performances. This method draws on previous w...
Joanne H. Walker, Myra S. Wilson
RTSS
2008
IEEE
14 years 1 months ago
Delay-Aware Period Assignment in Control Systems
We consider the problem of optimal static period assignment for multiple independent control tasks executing on the same CPU. Previous works have assumed that the control performa...
Enrico Bini, Anton Cervin
RTAS
2003
IEEE
14 years 24 days ago
Feedback Control Real-Time Scheduling in ORB Middleware
Existing real-time ORB middleware standards such as RT-CORBA do not adequately address the challenges of 1) providing robust performance guarantees portably across different platf...
Chenyang Lu, Xiaorui Wang, Christopher D. Gill
ICMCS
2007
IEEE
123views Multimedia» more  ICMCS 2007»
14 years 1 months ago
Efficient Parallelization of H.264 Decoding with Macro Block Level Scheduling
The H.264 decoder has a sequential, control intensive front end that makes it difficult to leverage the potential performance of emerging manycore processors. Preparsing is a fun...
Jike Chong, Nadathur Satish, Bryan C. Catanzaro, K...
RTSS
2002
IEEE
14 years 14 days ago
Approximate Schedulability Analysis
The schedulability analysis problem for many realistic task models is intractable. Therefore known algorithms either have exponential complexity or at best can be solved in pseudo...
Samarjit Chakraborty, Simon Künzli, Lothar Th...