Sciweavers

4806 search results - page 100 / 962
» Interactive uncertainty analysis
Sort
View
WSC
2008
15 years 4 months ago
A simulation based scheduling model for call centers with uncertain arrival rates
In this paper we develop a two stage algorithm for scheduling call centers with strict SLAs and arrival rate uncertainty. The first cut schedule can be developed in less than a mi...
Thomas R. Robbins, Terry P. Harrison
ATAL
2010
Springer
15 years 3 months ago
Merging example plans into generalized plans for non-deterministic environments
We present a new approach for finding generalized contingent plans with loops and branches in situations where there is uncertainty in state properties and object quantities, but ...
Siddharth Srivastava, Neil Immerman, Shlomo Zilber...
136
Voted
AROBOTS
2006
119views more  AROBOTS 2006»
15 years 2 months ago
A Discussion of Simultaneous Localization and Mapping
This paper aims at a discussion of the structure of the SLAM problem. The analysis is not strictly formal but based both on informal studies and mathematical derivation. The first ...
Udo Frese
TIT
1998
86views more  TIT 1998»
15 years 2 months ago
Maximin Performance of Binary-Input Channels with Uncertain Noise Distributions
—We consider uncertainty classes of noise distributions defined by a bound on the divergence with respect to a nominal noise distribution. The noise that maximizes the minimum e...
Andrew L. McKellips, Sergio Verdú
ICRA
2010
IEEE
138views Robotics» more  ICRA 2010»
15 years 1 months ago
Maximum likelihood mapping with spectral image registration
Abstract— A core challenge in probabilistic mapping is to extract meaningful uncertainty information from data registration methods. While this has been investigated in ICP-based...
Max Pfingsthorn, Andreas Birk 0002, Sören Sch...