Sciweavers

300 search results - page 15 / 60
» Machine Scheduling with Availability Constraints
Sort
View
VTC
2007
IEEE
14 years 1 months ago
MIMO Downlink Weighted Sum Rate Maximization with Power Constraints per Antenna Groups
Abstract— We consider a single-cell multiple-input multipleoutput (MIMO) downlink channel where linear transmission and reception strategy is employed. The base station (BS) tran...
Marian Codreanu, Antti Tölli, Markku J. Juntt...
CPAIOR
2007
Springer
14 years 1 months ago
A Column Generation Based Destructive Lower Bound for Resource Constrained Project Scheduling Problems
In this paper we present a destructive lower bound for a number of resource constrained project scheduling (RCPS) problems, which is based on column generation. We first look at t...
J. M. van den Akker, Guido Diepen, J. A. Hoogeveen
PUK
2000
13 years 8 months ago
Scheduling in a Planning Environment
In a real planning problem, there exists a set of constraints (both temporal constraints and resource usage constraints) which must be satisfied in order to obtain a feasible plan....
Antonio Garrido Tejero, Miguel A. Salido, Federico...
TOCS
2008
154views more  TOCS 2008»
13 years 7 months ago
Adaptive work-stealing with parallelism feedback
We present an adaptive work-stealing thread scheduler, ASTEAL, for fork-join multithreaded jobs, like those written using the Cilk multithreaded language or the Hood work-stealing...
Kunal Agrawal, Charles E. Leiserson, Yuxiong He, W...
TCAD
1998
114views more  TCAD 1998»
13 years 7 months ago
Behavioral optimization using the manipulation of timing constraints
— We introduce a transformation, named rephasing, that manipulates the timing parameters in control-data-flow graphs (CDFG’s) during the high-level synthesis of data-pathinten...
Miodrag Potkonjak, Mani B. Srivastava