In the process of developing an Information System, one passes through stages that include requirements gathering, design specification, and software implementation. The purpose ...
Alexander Borgida, John Mylopoulos, Joachim W. Sch...
The use of an Interim Connection Space (ICS) is proposed as a means for extending the concept of device independent color management to support spectral imaging. Color management,...
In this article we present the University of Evora's Integrated Information System (SIIUE), which is meant to model most of the information necessary for the management and da...
Process-Centered Software Engineering Environments (PSEEs) deal with activities that demand limited resources. Characteristics about required resources and their dynamic availabili...
Carla Alessandra Lima Reis, Rodrigo Quites Reis, H...
This paper studies a general dynamic buffer management problem with one buffer inserted between two interacting components. The component to be controlled is assumed to have multi...