This paper presents a study that uses simulation to improve shop floor performance by means of two layout types and certain operational parameters. In this study, an overview of t...
A multi-heuristic schedule repair model for schedule conflict resolution is presented and its application in repairing the schedules of a prefabrication plant is described in this...
An ever-growing infrastructure, including existing and newly built power plants, as well as a rising environmental awareness in society call for inspection and maintenance systems...
The phenomenology of genetically engineered plant sentinels as measured by spectral imaging remote sensors is investigated. Plant sentinels have been developed to cease chlorophyl...
Danielle Simmons, John Kerekes, Daniel Rahn, Arnab...