Sciweavers

309 search results - page 2 / 62
» Robotics for Plant Production
Sort
View
WSC
2004
13 years 9 months ago
Simulation-Based Layout Planning of a Production Plant
This paper presents a study that uses simulation to improve shop floor performance by means of two layout types and certain operational parameters. In this study, an overview of t...
Mert Altinkilinc
AIPS
2003
13 years 9 months ago
A Multi-Heuristic GA for Schedule Repair in Precast Plant Production
A multi-heuristic schedule repair model for schedule conflict resolution is presented and its application in repairing the schedules of a prefabrication plant is described in this...
Weng Tat Chan, Tan Heng Wee
CCE
2010
13 years 4 months ago
Production scheduling of a multi-grade PET resin plant
George Liberopoulos, George Kozanidis, Olympia Hat...
ATAL
2010
Springer
13 years 8 months ago
MagneBike: toward multi climbing robots for power plant inspection
An ever-growing infrastructure, including existing and newly built power plants, as well as a rising environmental awareness in society call for inspection and maintenance systems...
Andreas Breitenmoser, Fabien Tâche, Gilles C...
IGARSS
2010
13 years 5 months ago
Hyperspectral imaging phenomenology of genetically engineered plant sentinels
The phenomenology of genetically engineered plant sentinels as measured by spectral imaging remote sensors is investigated. Plant sentinels have been developed to cease chlorophyl...
Danielle Simmons, John Kerekes, Daniel Rahn, Arnab...