Sciweavers

293 search results - page 31 / 59
» Simulation and uncertainty modeling of project schedules est...
Sort
View
WSC
2004
13 years 10 months ago
Hierarchical Production Planning Using a Hybrid System Dynamic - Discrete Event Simulation Architecture
Hierarchical production planning provides a formal bridge between long-term plans and short-term schedules. A hybrid simulation-based production planning architecture consisting o...
Jayendran Venkateswaran, Young-Jun Son, Albert Jon...
JSSPP
2005
Springer
14 years 2 months ago
Wave Scheduler: Scheduling for Faster Turnaround Time in Peer-Based Desktop Grid Systems
The recent success of Internet-based computing projects, coupled with rapid developments in peer-to-peer systems, has stimulated interest in the notion of harvesting idle cycles u...
Dayi Zhou, Virginia Mary Lo
SIMULATION
2002
142views more  SIMULATION 2002»
13 years 8 months ago
Agent-based Planning and Simulation of Combined Rail/Road Transport
A simulation model of the flow of Intermodal Terminal Units (ITUs) among inland intermodal terminals is presented. The intermodal terminals are inter-connected by rail corridors. ...
Luca Maria Gambardella, Andrea Emilio Rizzoli, Pet...
PPOPP
2006
ACM
14 years 2 months ago
A case study in top-down performance estimation for a large-scale parallel application
This work presents a general methodology for estimating the performance of an HPC workload when running on a future hardware architecture. Further, it demonstrates the methodology...
Ilya Sharapov, Robert Kroeger, Guy Delamarter, Raz...
ICRA
2006
IEEE
111views Robotics» more  ICRA 2006»
14 years 3 months ago
Placement and Distributed Deployment of Sensor Teams for Triangulation based Localization
— We address the problem of placing a sensor network so as to minimize the uncertainty in estimating the position of targets. The novelty of our formulation is in the sensing mod...
Volkan Isler