Sciweavers

293 search results - page 40 / 59
» Simulation and uncertainty modeling of project schedules est...
Sort
View
WSC
2008
13 years 10 months ago
Demand forecast of semiconductor products based on technology diffusion
Demand forecast plays a critical role to determine capital investment for capacity planning. Given the involved uncertainties and long lead-time for capacity expansion, semiconduc...
Chen-Fu Chien, Yun-Ju Chen, Jin-Tang Peng
IPSN
2007
Springer
14 years 1 months ago
Power scheduling for wireless sensor and actuator networks
We previously presented a model for some wireless sensor and actuator network (WSAN) applications based on the vector space tools of frame theory. In this WSAN model there is a we...
Christopher J. Rozell, Don H. Johnson
ICDCS
2006
IEEE
14 years 1 months ago
Reputation-Based Scheduling on Unreliable Distributed Infrastructures
This paper presents a design and analysis of scheduling techniques to cope with the inherent unreliability and instability of worker nodes in large-scale donation-based distribute...
Jason D. Sonnek, Mukesh Nathan, Abhishek Chandra, ...
ISCAS
2006
IEEE
129views Hardware» more  ISCAS 2006»
14 years 1 months ago
Computing during supply voltage switching in DVS enabled real-time processors
In recent times, much attention has been devoted to power optimization for real-time systems, while guaranteeing that such systems meet their hard (or soft) scheduling deadlines. ...
Chunjie Duan, Sunil P. Khatri
VTC
2007
IEEE
134views Communications» more  VTC 2007»
14 years 2 months ago
Effect of Channel-Quality Indicator Delay on HSDPA Performance
This paper evaluates the effect of the channel estimation inaccuracy on the performance of an HSDPA system. This study provides some results from system level simulations that have...
David Martin-Sacristan, Jose F. Monserrat, Javier ...