This paper intends to show that the time needed to solve mixed integer programming problems by branch and bound can be roughly predicted early in the solution process. We construc...
: In this paper, we address a lot splitting and scheduling problem existent in a textile factory. The factory we study produces a set of products that are made of, or assembled fro...
Carina Pimentel, Filipe Pereira Alvelos, Antonio D...
Production planning is an important task in manufacturing systems. We consider a real-world capacitated lot-sizing problem (CLSP) from the process industry. Because the problem re...
Joachim P. Walser, Ramesh Iyer, Narayan Venkatasub...
Call control features (e.g., call-divert, voice-mail) are primitive options to which users can subscribe off-line to personalise their service. The configuration of a feature su...
David Lesaint, Deepak Mehta, Barry O'Sullivan, Lui...
Abstract— We study multi-robot routing problems (MRLDR) where a team of robots has to visit a set of given targets with linear decreasing rewards over time, such as required for ...