—Constraint satisfaction has been a very successful paradigm for solving problems such as resource allocation and planning. Many of these problems pose themselves in a context in...
Integrated modeling of temporal and logical constraints is important for solving real-life planning and scheduling problems. Logical constrains extend the temporal formalism by rea...
Design closure becomes hard to achieve at physical layout stage due to the emergence of long global interconnects. Consequently, interconnect planning needs to be integrated in hi...
High dimensionality of belief space in DEC-POMDPs is one of the major causes that makes the optimal joint policy computation intractable. The belief state for a given agent is a p...
Abstract. One-degree-of-freedom mechanisms induced by minimum pseudotriangulations with one convex hull edge removed have been recently introduced by the author to solve a family o...