This paper attempts to analyze the issue of planning and scheduling integration from the point of view of information sharing. This concept is the basic bridging factor between the...
We present a case study in confronting the GPT generalpurpose planner with the challenging power supply restoration (PSR) benchmark for contingent planning. PSR is derived from a ...
The PRODIGY system is based on bidirectional planning, which is a combination of goal-directed backward chaining with simulation of plan execution. Experiments have demonstrated t...
The optimal motion generation problem is solved subject to various actuator constraints while the motion is constrained to an arbitrary path. The considered objective function is ...
In multiagent planning, it is often convenient to view a problem as two subproblems: agent local planning and coordination. Thus, we can classify agent activities into two categor...