Sciweavers

401 search results - page 37 / 81
» Static Dependent Costs for Estimating Execution Time
Sort
View
COMCOM
1998
106views more  COMCOM 1998»
13 years 7 months ago
Algorithms for delay-constrained low-cost multicast tree construction
With the proliferation of multimedia group applications, the construction of multicast trees satisfying Quality of Service QoS requirements is becoming a problem of prime import...
R. Sriram, Govindarasu Manimaran, C. Siva Ram Murt...
PPOPP
2003
ACM
14 years 28 days ago
Compiler support for speculative multithreading architecture with probabilistic points-to analysis
Speculative multithreading (SpMT) architecture can exploit thread-level parallelism that cannot be identified statically. Speedup can be obtained by speculatively executing threa...
Peng-Sheng Chen, Ming-Yu Hung, Yuan-Shin Hwang, Ro...
DATE
2008
IEEE
103views Hardware» more  DATE 2008»
14 years 2 months ago
Compositional design of isochronous systems
The synchronous modeling paradigm provides strong execution correctness guarantees to embedded system design while making minimal environmental assumptions. In most related framew...
Jean-Pierre Talpin, Julien Ouy, Loïc Besnard,...
JTRES
2010
ACM
13 years 8 months ago
Exhaustive testing of safety critical Java
With traditional testing, the test case has no control over non-deterministic scheduling decisions, and thus errors dependent on scheduling are only found by pure chance. Java Pat...
Tomás Kalibera, Pavel Parizek, Michal Maloh...
EMSOFT
2006
Springer
13 years 11 months ago
Modeling a system controller for timing analysis
Upper bounds on worst-case execution times, which are commonly called WCET, are a prerequisite for validating the temporal correctness of tasks in a real-time system. Due to the e...
Stephan Thesing