Sciweavers

9842 search results - page 1884 / 1969
» The Complexity of the Matching-Cut Problem
Sort
View
BROADNETS
2006
IEEE
14 years 1 months ago
Distributed Job Scheduling based on Multiple Constraints Anycast Routing
— As the popularity of resource-constrained devices such as hand-held computers increases, a new network service offloading complex processing tasks towards computational resour...
Tim Stevens, Marc De Leenheer, Filip De Turck, Bar...
GLOBECOM
2006
IEEE
14 years 1 months ago
Linear Coherent Decentralized Estimation
Abstract—We consider the distributed estimation of an unknown vector signal in a resource constrained sensor network with a fusion center. Due to power and bandwidth limitations,...
Jinjun Xiao, Shuguang Cui, Zhi-Quan Luo, Andrea J....
ICRA
2006
IEEE
137views Robotics» more  ICRA 2006»
14 years 1 months ago
Fast C-obstacle Query Computation for Motion Planning
— The configuration space of a robot is partitioned into free space and C-obstacle space. Most of the prior work in collision detection and motion planning algorithms is targete...
Liangjun Zhang, Young J. Kim, Gokul Varadhan, Dine...
INFOCOM
2006
IEEE
14 years 1 months ago
The Internet Dark Matter - on the Missing Links in the AS Connectivity Map
Abstract— The topological structure of the Internet infrastructure is an important and interesting subject that attracted significant research attention in the last few years. A...
Rami Cohen, Danny Raz
INFOCOM
2006
IEEE
14 years 1 months ago
Integrated Intermediate Waveband and Wavelength Switching for Optical WDM Mesh Networks
— As wavelength-division multiplexing (WDM) evolves towards practical applications in optical transport networks, waveband switching (WBS) has been introduced to cut down the ope...
Mengke Li, Byrav Ramamurthy
« Prev « First page 1884 / 1969 Last » Next »