Sciweavers

50 search results - page 6 / 10
» Trustworthy Dynamic Scheduling based on Constraint Solving S...
Sort
View
ADBIS
1998
Springer
180views Database» more  ADBIS 1998»
13 years 11 months ago
Designing Persistence for Real-Time Distributed Object Systems
An implementation of persistent object store for real-time systems with strict processing time constraints is a challenging task, because many traditional database techniques, e.g....
Igor Nekrestyanov, Boris Novikov, Ekaterina Pavlov...
FLAIRS
2003
13 years 8 months ago
Incremental Breakout Algorithm with Variable Ordering
This paper presents the Incremental Breakout Algorithm with Variable Ordering (IncBA). This algorithm belongs to the class of local search algorithms for solving Constraint Satisf...
Carlos Eisenberg, Boi Faltings
ICCD
2001
IEEE
121views Hardware» more  ICCD 2001»
14 years 4 months ago
Determining Schedules for Reducing Power Consumption Using Multiple Supply Voltages
Dynamic power is the main source of power consumption in CMOS circuits. It depends on the square of the supply voltage. It may significantly be reduced by scaling down the supply ...
Noureddine Chabini, El Mostapha Aboulhamid, Yvon S...
IPPS
2000
IEEE
13 years 12 months ago
Switch Scheduling in the Multimedia Router (MMR)
The primary goal of the Multimedia Router (MMR) project is the design and implementation of a router optimized for multimedia applications. The router is targeted for use in clust...
Damon S. Love, Sudhakar Yalamanchili, José ...
CDC
2009
IEEE
189views Control Systems» more  CDC 2009»
14 years 5 days ago
Maximizing aggregated revenue in sensor networks under deadline constraints
Abstract— We study the problem of maximizing the aggregated revenue in sensor networks with deadline constraints. Our model is that of a sensor network that is arranged in the fo...
Srikanth Hariharan, Ness B. Shroff