Sciweavers

344 search results - page 10 / 69
» Using Simulation to Schedule Manufacturing Resources
Sort
View
WSC
2001
13 years 9 months ago
Using simulation to evaluate site traffic at an automobile truck plant
Recent trends in automotive manufacturing have increased the focus on the Just-In-Time (JIT) delivery of automotive components. By requiring smaller batches of parts delivered mor...
Joseph Hugan
WSC
1997
13 years 9 months ago
Arena Software Tutorial
The Arena modeling system from Systems Modeling Corporation is a flexible and powerful tool that allows analysts to create animated simulation models that accurately represent vir...
David A. Takus, David M. Profozich
WSC
2000
13 years 9 months ago
An analytical model and an optimal scheduling heuristic for collective resource management
In the this paper, we study the problem of collective resource management. We first introduce the problem through realworld examples. Then we generalize the problem and build an a...
Qiang Sun
AUSAI
2005
Springer
14 years 1 months ago
Adaptive Utility-Based Scheduling in Resource-Constrained Systems
This paper addresses the problem of scheduling jobs in soft real-time systems, where the utility of completing each job decreases over time. We present a utility-based framework fo...
David Vengerov
LCN
2003
IEEE
14 years 1 months ago
Scheduling Resources in Programmable and Active Networks Based on Adaptive Estimations
In active and programmable networks, packet processing could be accomplished in the router within the data path. For efficient resource allocation in such networks, the packet sch...
Fariza Sabrina, Sanjay Jha