Sciweavers

2212 search results - page 203 / 443
» Weighted control scheduling
Sort
View
151
Voted
CDC
2010
IEEE
226views Control Systems» more  CDC 2010»
14 years 10 months ago
Fast primal-dual projected linear iterations for distributed consensus in constrained convex optimization
In this paper we study the constrained consensus problem, i.e. the problem of reaching a common point from the estimates generated by multiple agents that are constrained to lie in...
Ion Necoara, Ioan Dumitrache, Johan A. K. Suykens
118
Voted
HPCA
2000
IEEE
15 years 8 months ago
Flit-Reservation Flow Control
This paper presents flit-reservation flow control, in which control flits traverse the network in advance of data flits, reserving buffers and channel bandwidth. Flit-reservation ...
Li-Shiuan Peh, William J. Dally
RTSS
2009
IEEE
15 years 10 months ago
New Response Time Bounds for Fixed Priority Multiprocessor Scheduling
Recently, there have been several promising techniques developed for schedulability analysis and response time analysis for multiprocessor systems based on over-approximation. Thi...
Nan Guan, Martin Stigge, Wang Yi, Ge Yu
124
Voted
GLOBECOM
2008
IEEE
15 years 10 months ago
On Traffic Long-Range Dependence at the Output of Schedulers with Multiple Service Classes
 Long-range dependence (LRD) is a widely verified property of Internet traffic, which severely impacts network performance yielding longer queuing delays. Moreover, LRD is almos...
Stefano Bregni, Paolo Giacomazzi, Gabriella Saddem...
RTAS
2008
IEEE
15 years 10 months ago
Throttling On-Disk Schedulers to Meet Soft-Real-Time Requirements
To achieve better throughput, many hard drive manufacturers use internal queues and scheduling to take advantage of vendor-specific characteristics and knowledge. While this tren...
Mark J. Stanovich, Theodore P. Baker, An-I Andy Wa...