Sciweavers

415 search results - page 12 / 83
» time 1994
Sort
View
AAAI
1994
13 years 11 months ago
Automated Modeling for Answering Prediction Questions: Selecting the Time Scale and System Boundary
The ability to answer prediction questions is crucial to reasoning about physical systems. A prediction question poses a hypothetical scenario and asks for the resulting behavior ...
Jeff Rickel, Bruce W. Porter
NAACL
1994
13 years 11 months ago
Techniques to Achieve an Accurate Real-Time Large-Vocabulary Speech Recognition System
In addressing the problem of achieving high-accuracy real-time speech recognition systems, we focus on recognizing speech from ARPA's20,000-word Wall Street Journal (WSJ) tas...
Hy Murveit, Peter Monaco, Vassilios Digalakis, Joh...
WSC
2004
13 years 11 months ago
Controlling Over-Optimism in Time-Warp Via CPU-Based Flow Control
In standard optimistic parallel event simulation, no restriction exists on the maximum lag in simulation time between the fastest and slowest logical processes (LPs). Overoptimist...
Vinay Sachdev, Maria Hybinette, Eileen Kraemer
EURODAC
1994
IEEE
122views VHDL» more  EURODAC 1994»
14 years 1 months ago
Compiled-code-based simulation with timing verification
Due to the complexity of today's systems, prototyping by simulation must be based on simulation-engine-like performance. It is proved by implementations that compiler-driven ...
Winfried Hahn, Andreas Hagerer, C. Herrmann
SWAT
1994
Springer
130views Algorithms» more  SWAT 1994»
14 years 1 months ago
Dominating Cliques in Distance-Hereditary Graphs
A graph is distance-hereditary if and only if each cycle on five or more vertices has at least two crossing chords. We present linear time algorithms for the minimum r-dominating c...
Feodor F. Dragan