Sciweavers

EOR
2006
125views more  EOR 2006»
13 years 11 months ago
A genetic algorithm for robotic assembly line balancing
Flexibility and automation in assembly lines can be achieved by the use of robots. The robotic assembly line balancing (RALB) problem is defined for robotic assembly line, where d...
Gregory Levitin, Jacob Rubinovitz, Boris Shnits
EOR
2006
65views more  EOR 2006»
13 years 11 months ago
Generation of assembly graphs by systematic analysis of assembly structures
: Aimed at detection of parallel assembly modes, a method for assembly graph construction is described that is based on the systematic generation and analysis of precedence relatio...
Alfred J. D. Lambert
EOR
2006
49views more  EOR 2006»
13 years 11 months ago
A game-theoretic formulation of joint implementation of environmental projects
The aim of this paper is to provide a game-theoretic interpretation of joint implementation in environmental projects and to assess the merit of such a strategy. More specifically...
Michèle Breton, Georges Zaccour, Mehdi Zaha...
EOR
2006
129views more  EOR 2006»
13 years 11 months ago
Balancing assembly lines with tabu search
Balancing assembly lines is a crucial task for manufacturing companies in order to improve productivity and minimize production costs. Despite some progress in exact methods to so...
Sophie D. Lapierre, Angel B. Ruiz, Patrick Soriano
EOR
2006
78views more  EOR 2006»
13 years 11 months ago
Monte Carlo analysis of convertible bonds with reset clauses
Toshikazu Kimura, Toshio Shinohara
EOR
2006
58views more  EOR 2006»
13 years 11 months ago
How real option disinvestment flexibility augments project NPV
Aneel Keswani, Mark B. Shackleton
EOR
2006
88views more  EOR 2006»
13 years 11 months ago
Nonessential objectives within network approaches for MCDM
In Gal and Hanne [Eur. J. Oper. Res. 119 (1999) 373] the problem of using several methods to solve a multiple criteria decision making (MCDM) problem with linear objective functio...
Tomas Gal, Thomas Hanne
EOR
2006
104views more  EOR 2006»
13 years 11 months ago
An linear programming based lower bound for the simple assembly line balancing problem
The simple assembly line balancing problem is a classical integer programming problem in operations research. A set of tasks, each one being an indivisible amount of work requirin...
Marc Peeters, Zeger Degraeve