Cluster tools have been one of the proposed alternatives to improve operations performance in semiconductor fabrication. The benefits include high yield throughput, less contamination and less human involvement. Perkinson et al. (1994, 1996) developed analytical models to predict the minimum theoretical time required to complete the cycle in a cluster tool. This paper addresses the verification of these analytical models using simulation. Two simulation models were developed