Sciweavers

ATMOS
2009

Scheduling Aircraft to Reduce Controller Workload

14 years 1 months ago
Scheduling Aircraft to Reduce Controller Workload
We address a problem in air traffic management: scheduling flights in order to minimize the maximum number of aircraft that simultaneously lie within a single air traffic control sector at some time t. Since the problem is a generalization of the NP-hard nowait job-shop scheduling, we resort to heuristics. We report experimental results for real-world flight data.
Joondong Kim, Alexander Kroeller, Joseph S. B. Mit
Added 08 Nov 2010
Updated 08 Nov 2010
Type Conference
Year 2009
Where ATMOS
Authors Joondong Kim, Alexander Kroeller, Joseph S. B. Mitchell
Comments (0)