We consider on-line scheduling of unit time jobs on a single machine with job-dependent penalties. The jobs arrive on-line (one by one) and can be either accepted and scheduled, or be rejected at the cost of a penalty. The objective is to minimize the total completion time of the accepted jobs plus the sum of the penalties of the rejected jobs. We give an on-line algorithm for this problem with competitive ratio 1 2 (2 + 3) 1:86602. Moreover, we prove that
Leah Epstein, John Noga, Gerhard J. Woeginger