Sciweavers

55 search results - page 7 / 11
» A genetic algorithm for the resource constrained multi-proje...
Sort
View
DATE
2006
IEEE
92views Hardware» more  DATE 2006»
14 years 1 months ago
Priority scheduling in digital microfluidics-based biochips
Discrete droplet digital microfluidics-based biochips face problems similar to that in other VLSI CAD systems, but with new constraints and interrelations. We focus on one such pr...
Andrew J. Ricketts, Kevin M. Irick, Narayanan Vija...
EOR
2007
111views more  EOR 2007»
13 years 7 months ago
Linear programming based algorithms for preemptive and non-preemptive RCPSP
: In this paper, the RCPSP (Resource Constrained Project Scheduling Problem) is solved using a linear programming model. Each activity may or may not be preemptive. Each variable i...
Jean Damay, Alain Quilliot, Eric Sanlaville
ICCS
2005
Springer
14 years 26 days ago
Resource Partitioning Algorithms in a Programmable Service Grid Architecture
Abstract. We propose the use of programmable Grid resource partitioning heuristics in the context of a distributed service Grid management architecture. The architecture is capable...
Pieter Thysebaert, Bruno Volckaert, Marc De Leenhe...
HEURISTICS
2002
152views more  HEURISTICS 2002»
13 years 7 months ago
A Constraint-Based Method for Project Scheduling with Time Windows
This paper presents a heuristic algorithm for solving RCPSP/max, the resource constrained project scheduling problem with generalized precedence relations. The algorithm relies, a...
Amedeo Cesta, Angelo Oddi, Stephen F. Smith
EVOW
2007
Springer
14 years 1 months ago
Exact/Heuristic Hybrids Using rVNS and Hyperheuristics for Workforce Scheduling
In this paper we study a complex real-world workforce scheduling problem. We propose a method of splitting the problem into smaller parts and solving each part using exhaustive sea...
Stephen Remde, Peter I. Cowling, Keshav P. Dahal, ...