Abstract— Optical Burst and Packet Switching are being considered as the most promising paradigms to increase bandwidth efficiency in IP over DWDM networks. In both cases, due t...
In this paper the one-machine scheduling problem with linear earliness and tardiness costs is considered. The7 cost functions are job dependent and asymmetric. The problem consist...
In this paper we present an ant-based algorithm for solving unconstrained multi-level lot-sizing problems called ant system for multi-level lot-sizing algorithm (ASMLLS). We apply...
Rapeepan Pitakaso, Christian Almeder, Karl F. Doer...
Abstract. In this work we introduce a new generalization of the ResourceConstrained Project Scheduling Problem – the Mobile Workforce Scheduling Problem with Multitask-Processes ...
A well known industry application that allows controllable processing times is the manufacturing operations on CNC machines. For each turning operation as an example, there is a n...