Sciweavers

638 search results - page 35 / 128
» Activity-Based Scheduling of IT Changes
Sort
View
ECRTS
2010
IEEE
13 years 7 months ago
On Schedulability Analysis of Non-cyclic Generalized Multiframe Tasks
— The generalized multiframe (GMF) task has been proposed to model a task whose execution times, deadlines and minimum separation times are changed according to a specified patte...
Noel Tchidjo Moyo, Eric Nicollet, Frederic Lafaye,...
RTS
2002
113views more  RTS 2002»
13 years 7 months ago
Feedback-Feedforward Scheduling of Control Tasks
A scheduling architecture for real-time control tasks is proposed. The scheduler uses feedback from execution-time measurements and feedforward from workload changes to adjust the...
Anton Cervin, Johan Eker, Bo Bernhardsson, Karl-Er...
SCHEDULING
2008
152views more  SCHEDULING 2008»
13 years 7 months ago
Bicriteria robotic cell scheduling
This paper considers the scheduling problems arising in two- and three-machine manufacturing cells configured in a flowshop which repeatedly produces one type of product and where ...
Hakan Gultekin, M. Selim Akturk, Oya Ekin Karasan
ICCAD
2009
IEEE
93views Hardware» more  ICCAD 2009»
13 years 5 months ago
An efficient wakeup scheduling considering resource constraint for sensor-based power gating designs
Power gating has been a very effective way to reduce leakage power. One important design issue for a power gating design is to limit the surge current during the wakeup process. N...
Ming-Chao Lee, Yu-Ting Chen, Yo-Tzu Cheng, Shih-Ch...
SI3D
1995
ACM
13 years 11 months ago
Behavioral Control for Real-Time Simulated Human Agents
A system for controlling the behaviors of an interactive human-like agent, and executing them in real-time, is presented. It relies on an underlying model of continuous behavior, ...
John P. Granieri, Welton Becket, Barry D. Reich, J...