Sciweavers

1217 search results - page 54 / 244
» Improved scheduling of control tasks
Sort
View
DATE
2008
IEEE
95views Hardware» more  DATE 2008»
15 years 11 months ago
Improvements in Polynomial-Time Feasibility Testing for EDF
This paper presents two fully polynomial-time sufficient feasibility tests for EDF when considering periodic tasks with arbitrary deadlines and preemptive scheduling on uniproces...
Alejandro Masrur, Sebastian Drossler, Georg Farber
ICUMT
2009
15 years 2 months ago
Joint power control, scheduling and routing for multicast in multihop energy harvesting sensor networks
We consider the problem of joint power control, scheduling and routing in energy harvesting sensor networks allowing for multicast of data generated at the sensor nodes to a set of...
Vinay Joseph, Vinod Sharma, Utpal Mukherji, Manjun...
JSSPP
2010
Springer
15 years 2 months ago
Hierarchical Scheduling of DAG Structured Computations on Manycore Processors with Dynamic Thread Grouping
Many computational solutions can be expressed as directed acyclic graphs (DAGs) with weighted nodes. In parallel computing, scheduling such DAGs onto manycore processors remains a ...
Yinglong Xia, Viktor K. Prasanna, James Li
RTSS
2007
IEEE
15 years 11 months ago
Utilization-Bound Based Schedulability Analysis of Weighted Round Robin Schedulers
Schedulability analysis is a cornerstone of modern real-time scheduling theory development. Utilizationbound based schedulability test is considered one of most efficient and effe...
Jianjia Wu, Jyh-Charn Liu, Wei Zhao
ETFA
2006
IEEE
15 years 8 months ago
Component based deployment of industrial control systems: a hybrid scheduling approach
This paper deals with the IEC 61499 standard. A function block (FB) is an event triggered component and an application is a distributed FBs network on several devices. We consider...
Mohamed Khalgui, Xavier Rebeuf, Françoise S...