Sciweavers

3563 search results - page 17 / 713
» Scheduling Algorithms for Procrastinators
Sort
View
AIPS
2003
13 years 9 months ago
A Multi-Heuristic GA for Schedule Repair in Precast Plant Production
A multi-heuristic schedule repair model for schedule conflict resolution is presented and its application in repairing the schedules of a prefabrication plant is described in this...
Weng Tat Chan, Tan Heng Wee
ICPP
2005
IEEE
14 years 1 months ago
A Task Duplication Based Scheduling Algorithm Using Partial Schedules
We propose a novel replication-based two-phase scheduling algorithm designed to achieve DAG scheduling with small makespans and high efficiency. In the first phase, the schedule...
Doruk Bozdag, Füsun Özgüner, Eylem ...
MST
2008
157views more  MST 2008»
13 years 7 months ago
Optimal On-Line Algorithms to Minimize Makespan on Two Machines with Resource Augmentation
We study the problem of on-line scheduling on two uniformly related machines where the on-line algorithm has resources different from those of the off-line algorithm. We consider ...
Leah Epstein, Arik Ganot
IPPS
2000
IEEE
14 years 2 days ago
S3MP: A Task Duplication Based Scalable Scheduling Algorithm for Symmetric Multiprocessors
We present a task duplication based scalable scheduling algorithm for Symmetric Multiprocessors (SMP), called S3MP (Scalable Scheduling for SMP), to address the problem of task sc...
Oh-Han Kang, Dharma P. Agrawal
ICRA
1994
IEEE
84views Robotics» more  ICRA 1994»
13 years 11 months ago
Real-World Extensions to a Production Scheduling Algorithm Based on Lagrangian Relaxation
In this article, we develop three eflcient extensions to a recent production scheduling algorithm based on Lagrangian relaxation [9]. These extensions handle the following real-wo...
Y. Narahari, Sundar Ram Vedula