We present a new propagator achieving bound consistency for the INTER-DISTANCE constraint. This constraint ensures that, among a set of variables X1, . . . , Xn, the difference be...
In past massively parallel processing systems, such as the TMC CM-5 and the CRI T3E, the scheduling problem consisted of allocating a single type of resource among the waiting job...
We propose an Integer Programming (IP) framework to undertake the dedicated photolithography machine constraint in semiconductor manufacturing. The constraint is one of the new ch...
Huy Nguyen Anh Pham, Arthur M. D. Shr, Peter P. Ch...
In this study, we deal with the robotic cell scheduling problem with two machines and identical parts. In an ideal FMS, CNC machines are capable of performing all the required ope...
This paper presents a heuristic algorithm for solving RCPSP/max, the resource constrained project scheduling problem with generalized precedence relations. The algorithm relies, a...