Sciweavers

77 search results - page 13 / 16
» Using Genetic Algorithms to Solve the Tactical Fixed Interva...
Sort
View
AAAI
1994
13 years 8 months ago
Solution Reuse in Dynamic Constraint Satisfaction Problems
Many AI problems can be modeled as constraint satisfaction problems (CSP), but many of them are actually dynamic: the set of constraints to consider evolves because of the environ...
Gérard Verfaillie, Thomas Schiex
TASE
2010
IEEE
13 years 2 months ago
Optimization of Group Elevator Scheduling With Advance Information
Group elevator scheduling has received considerable attention due to its importance to transportation efficiency for mid-rise and high-rise buildings. One important trend to improv...
Jin Sun, Qianchuan Zhao, Peter B. Luh
SCHEDULING
2008
67views more  SCHEDULING 2008»
13 years 6 months ago
Exact train pathing
Suppose we are given a schedule of train movements over a rail network into which a new train is to be included. The origin and the destination are specified for the new train; it...
Viswanath Nagarajan, Abhiram G. Ranade
DATE
1999
IEEE
162views Hardware» more  DATE 1999»
13 years 11 months ago
MOCSYN: Multiobjective Core-Based Single-Chip System Synthesis
In this paper, we present a system synthesis algorithm, called MOCSYN, which partitions and schedules embedded system specifications to intellectual property cores in an integrate...
Robert P. Dick, Niraj K. Jha
COR
2007
80views more  COR 2007»
13 years 7 months ago
Scheduling with tool changes to minimize total completion time under controllable machining conditions
Scheduling under controllable machining conditions has been studied for some time. Scheduling with tool changes, particularly due to tool wear, has just begun to receive attention...
M. Selim Akturk, Jay B. Ghosh, Rabia K. Kayan