We consider the total weighted completion time scheduling problem for parallel identical machines and precedence constraints, P jprecj PwiCi. This important and broad class of pro...
Ivan D. Baev, Waleed Meleis, Alexandre E. Eichenbe...
Abstract—Manufacturing process variations lead to circuit timing variability and a corresponding timing yield loss. Traditional corner analysis consists of checking all process c...
In this paper, we propose an extension of three incomplete depthfirst search techniques, namely depth-bounded backtrack search, credit search, and iterative broadening, towards pr...
Abstract. Evolutionary algorithms have been quite effective in dealing with single-objective “optimization” while the area of Evolutionary Multiobjective Optimization (EMOO) h...
This paper presents a fast algorithm to optimize both the widths and lengths of power/ground networks under reliability and power dip/ground bounce constraints. The spacesizing wh...