This paper presents a fast algorithm to optimize both the widths and lengths of power/ground networks under reliability and power dip/ground bounce constraints. The spacesizing wh...
In a behavioral synthesis system, a typical approach used to guide the scheduler is to impose hard constraints on the relative timing between operations considering performance, a...
Deterministic optimization approaches have been well developed and widely used in the process industry to accomplish off-line and on-line process optimization. The challenging tas...
In this paper we tackle the task assignment problem (TSAP) in heterogeneous computer systems. The TSAP consists of assigning a given distributed computer program formed by a numbe...
This paper describes an ongoing implementation of an open source library dealing with parametric representation of dynamic geometry constructions. We show how some current issues i...