Sciweavers

157 search results - page 5 / 32
» Sizing a pilot production line using simulation
Sort
View
WSC
1998
13 years 9 months ago
Simulating Haul Durations for Linear Scheduling
A major portion of highway construction work is comprised of linear activities. A linear activity is one that progresses along a path (non-stationary), as it does it is complete a...
David J. Harmelink, Maria Andrea Bernal
TASE
2011
IEEE
13 years 2 months ago
Multiclass Flow Line Models of Semiconductor Manufacturing Equipment for Fab-Level Simulation
—For multiclass flow line models, we identify a class of service times that allow a decomposition of the system into subsets of servers called channels. In each channel, the cus...
James R. Morrison
ICSE
2003
IEEE-ACM
14 years 24 days ago
A Tutorial on Feature Oriented Programming and Product-Lines
ct Feature Oriented Programming (FOP) is a design methodology and tools for program synthesis. The goal is to specify a target program in terms of the features that it offers, and ...
Don S. Batory
WSC
2000
13 years 9 months ago
Using simulation to support implementation of flexible manufacturing Cell
A simulation model was developed and tested using Taylor II to justify the implementation of a Flexible Manufacturing Cell (FMC). The current production capacity at the existing C...
Kambiz Farahmand
SIGMETRICS
2003
ACM
147views Hardware» more  SIGMETRICS 2003»
14 years 26 days ago
Effect of node size on the performance of cache-conscious B+-trees
In main-memory databases, the number of processor cache misses has a critical impact on the performance of the system. Cacheconscious indices are designed to improve performance b...
Richard A. Hankins, Jignesh M. Patel