Production scheduling, the problem of sequentially con guring a factory to meet forecasted demands, is a critical problem throughout the manufacturing industry. The requirement of...
Jeff G. Schneider, Justin A. Boyan, Andrew W. Moor...
In August of 1998 I completed the first hypertextual dissertation at Rensselaer Polytechnic Institute. The dissertation was a case study applying methods of rhetorical analysis an...
The subject of groundness analysis for (constraint) logic programs has been widely studied, and interesting domains have been proposed. Pos has been recognized as the most suitabl...
None of the available minimizers for exact 2-level hazard-free logic minimization can synthesize very large circuits. This limitation has forced researchers to resort to heuristic...
Timing analysis for checking satisfaction of constraints is a crucial problem in real-time system design. In some current approaches, the delay of software modules is precalculate...
Jie Liu, Marcello Lajolo, Alberto L. Sangiovanni-V...