Sciweavers

ISPASS
2006
IEEE

Critical path analysis of the TRIPS architecture

16 years 1 months ago
Critical path analysis of the TRIPS architecture
Fast, accurate, and effective performance analysis is essential for the design of modern processor architectures and improving application performance. Recent trends toward highly concurrent processors make this goal increasingly difficult. Conventional techniques, based on simulators and performance monitors, are ill-equipped to analyze how a plethora of concurrent events interact and how they affect performance. Prior research has shown the utility of critical path analysis in solving this problem [5, 18]. This analtracts the execution of a program with a dependence graph. With simple manipulations on the graph, designers can gain insights into the bottlenecks of a design. This paper extends critical path analysis to understand the performance of a next-generation, high-ILP architecture. The TRIPS architecture introduces new features not present in conventional superscalar architectures. We show how dependence constraints introduced by these features, specifically the execution mo...
Ramadass Nagarajan, Xia Chen, Robert G. McDonald,
Added 12 Jun 2010
Updated 12 Jun 2010
Type Conference
Year 2006
Where ISPASS
Authors Ramadass Nagarajan, Xia Chen, Robert G. McDonald, Doug Burger, Stephen W. Keckler
Comments (0)